
It's a bit of a religious debate as to where the plastic should be (below stone or below concrete), but I needed to stop the moisture until the slab is poured, so...



no hand tamping here...

My "Sanford & Son" scrap pile had to be replaced by a leach field. YES, more tree and stump removal...




With the cost of stone delivery going through roof these days, it was actually much cheaper, and easier, to go with a chamber system instead...




The prettiest it'll ever be...


Speed levelers ensure that all 3 trenches are used equally...

150 feet of trenches


I just need to back-fill...
